Using a boat to apply PAM |
PAM application using a boat |
Boat application to a smaller canal |
PAM-sediment flocs moving downstream |
Suspended sediment sampling |
Duck! |
Maybe we better let them pass? |
Weighing out PAM |
Using a StreamPro for water discharge measurements |
Flume on Smith Ditch #7 |
The motel maids are not too fond of us |
The end of a long day |
Sampling BMI troughs |
Levelling the troughs |
Point gauge to measure water height |
Partially hydrated PAM remaining in the Test Trough |
Test Trough -- Do you think there was high turbidity? |
Grand Junction USBR flume demonstration |